Mongolia Shangdu No.2 Power Generation Co., Ltd.

Project name: Inner Mongolia Shangdu No.2 Power Generation Co., Ltd. Phase III coal yard closed steel structure project;

■ Project location: Dundahaote Town, Zhenglan Banner, Xilin Gol League, Inner Mongolia Autonomous Region;

Structure type: prestressed pipe truss structure;

Project Description: The main steel structure is a prestressed pipe truss with three longitudinal axes, axis A\C is the axis of truss column foot, axis C is the axis of middle column, and the lower end is a fixed hinge support; The structure has a single arch and two spans, with a single arch span of 254m, a structural span of 186m+68m, a longitudinal span of 176m and a top elevation of 54.2 m; There are 12 main trusses and 95 secondary trusses; The specifications of the bars are between Φ 76x4 and Φ 500x25, and all of them are made of Q355C;. The main cable type of the string cable is D64, and the roof cables are D30 and D42. The cables are made of hot extruded polyethylene (double PE sheathing) high-strength steel cables.

■ Construction method: The hoisting method of "assembling parts+closing in the air+moving the jig frame" is adopted.

 

亿万官网全站商务合作信息公开网站内容管理中心

亿万官网(徐州)集团自成立以来,始终坚持以品质为核心,以信誉为根本。

亿万官网移动办公OA系统手机版APP下载中心



Xuzhou Yuhan steel structure

Years of industry experience accumulation, professional focus on steel structure engineering

更新:2026-08-07 20:48:57 | 链接:https://www.nxxzzm.cn/encase_show.aspx?id=34 | 来源:亿万官网企业核心服务系统登录与分销商端登陆后台 - Mongolia Shangdu No.2 Power Generation Co., Ltd.-Xuzhou Yuhan Steel Structure Co., Ltd.