Brief introduction of Nanyang Project
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Project Name: Steel structure and grid construction of Domestic waste Incineration power Generation Project
in the Catchment area of South-to-North Water Diversion Project
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Construction Unit: Nanyang Capital Environmental Technology Co., LTD
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Construction site: Caolou Village, Tianguan Town, Xixia County, Nanyang City, Henan Province
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Construction scale: The construction scale of this project is 1000T /d, equipped with 2 500t/d grate furnace type
garbage incinerators and 1 20MW pumping condensate type turbogenerator set, and the
equipment running time is no less than 8000h/a.
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Construction area: 30,245 square meters
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Main workshop height: 54.62 meters
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Main workshop span: 42 meters
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Total cost of steel structure: 26,285,330 yuan
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Total engineering quantity: 1797.185 tons
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Structure: tube truss (main workshop lattice column, garbage bin roof) + light steel (steam engine room, fly
ash curing workshop, lime slurry preparation room, lime dry powder room, activated carbon room
roof) + grid (boiler room, flue gas room, unloading hall roof)
亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Construction scope: including steel structure roof system of main workshop, garbage bin truss steel structure roof
system, steam engine room steel structure roof system, boiler room and flue gas purification
room roof system, fly ash curing workshop, lime slurry preparation room, lime dry powder room,
activated carbon room and other steel structure system,Roof system, gutter and siphon drainage
system.


亿万官网(徐州)集团以奋斗者为本,让付出有回报,让成长有平台。
Years of industry experience accumulation, professional focus on steel structure engineering